A failing system was replaced in under 30 days with Bio-Disk® package plant. The new solution meets TL-3 standards, supports site expansion, and ensures long-term compliance with minimal maintenance

End user West Virginia Department of Highways (WVDOH)

Location: DOH HQ Complex, West Virginia

Project Type: Old plant replacement

Capacity: 7,500 GPD

Commissioned: October 2023



Background

In October 2023, EPC Ltd. partnered with the WVDOH to replace a failing wastewater system at their headquarters with a modern, decentralized treatment solution. The new facility was installed and fully operational in under a month, using EPC’s patented Bio-Disk® fixed-bed biological technology, backed by 33+ years of field experience.

This project provided the infrastructure foundation for the future expansion of the headquarters complex and to avoid regulator fines for exceeding permit limits.


Issue

  • Outdated and inefficient system

  • Immediate need for compliant, high-quality treatment

  • Tight installation timeline to support planned site growth


 The Challenge

  • Strict TL-3 discharge requirements (high effluent standards)

  • Urgent schedule — full system replacement in <60 days 

  • Limited access, confined footprint, and government-level coordination

  • Need for a sustainable, low-OPEX solution that would scale with the facility


The EPC Solution

EPC deployed a Bio-Disk® Package Plant — a plug-and-play, decentralized system designed to operate quietly, cleanly, and efficiently with minimal operator input. Its modular, fixed-bed design offers proven biological treatment with industry-leading reliability.

System Highlights:

  • Rapid installation in under 60 days

  • TL-3 effluent quality (ammonia near-zero; fecal coliform undetectable)

  • Bio-Disk® fixed-film treatment with low energy demand

  • Designed for scalability, off-grid compatibility, and long-term durability

  • Quiet, odorless operation with minimal maintenance required


Project Results

  • Full EPA & WVDOH compliance within weeks

  • Consistently outstanding effluent quality after just 3 months

    • Ammonia: trending toward zero

    • Fecal coliform: not detected

    • Minimal solids & organic load

  • Reduced operational burden — no certified operator needed

  • Enables future expansion of the HQ complex

  • Model project for rural and government sites across the U.S.


Client Feedback

We appreciate your guidance and assistance. Thanks to EPC, the facility sample results are outstanding and fully compliant.”Sara, Environmental Specialist, WVDOH